Road closures in El Paso County, Las Cruces Thursday, March 7

EL PASO, Texas (KVIA) — Here’s a listing of street closures scheduled for Thursday, March 7 for El Paso County and the Metropolis of Las Cruces. For updates in El Paso, click on right here.  (

For a take a look at extra data from TxDOT, click on right here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click on right here. (

I-10 Widening West Challenge

Monday, March 4 at 6am, by Saturday, March 9 at 6pm

Non-Cease Lane Closure

  • Westbound I-10 will probably be decreased to 1 lane between Enchanted Hills Drive and David Street.

Crews will probably be putting in drainage pipe.

Guardrail Restore

Thursday, March 7

9 a.m. to 4 p.m.

  • Loop 375 (Border Freeway) eastbound between Padres and Zaragoza proper lane closed.

North Mesa Avenue Lighting Enchancment Challenge

Monday, March 4 by Friday, March 8

9 a.m. to 4 p.m.

·       Mesa north- and southbound between I-10 and Doniphan alternate lane closures.

  • Mesa north- and southbound between Argonaut and Sunland Park alternate lane closures.

Crews will probably be boring for electrical conduit, pouring drill shaft foundations, and potholing.

Site visitors Sign Enchancment Challenge

Monday, March 4 by Friday, March 8

9 a.m. to 4 p.m.

·     Mesa north- and southbound at Resler intersection proper lane closed.

·     Mesa north- and southbound at Camille intersection proper lane closed.

·     Montana east- and westbound at McRae intersection proper lane closed.

Crews will probably be engaged on intersection enhancements.

Monday, March 4 by Friday, March 8

9 a.m. to 4 p.m.

  • Gateway North and South at Hercules alternate lane closures.
  • North Loop and North Yarbrough intersection north-, south-, east-, and westbound alternate lane closures.
  • North Lee Trevino between Trawood and Montwood alternate lane closures.

Crews will probably be engaged on site visitors sign enhancements.

Site visitors Management Challenge

Monday, March 4 by Friday, March 8

9 a.m. to 4 p.m.

  • East Paisano and East Yandell intersection north and southbound alternate lane closures.

·       Gateway North and South at Hercules proper lane closed.

·       North Loop and North Yarbrough intersection north and southbound alternate lane closures.

Crews will probably be engaged on site visitors sign enhancements.

Upkeep

Monday, March 4 by Friday, March 8

40-Hr Full Closure-Day/Evening

  • Franklin eastbound between Kansas and Campbell left lane closed.
  • Entrance ramp to I-10 East left lane closed.

Crews will probably be repairing concrete.

Monday, March 4 by Friday, March 8

9 a.m. to three p.m.

  • Loop 375 (Cesar Chavez) between Park and Oregon proper lane closed.

Crews will probably be cleansing.

  • I-10 westbound at Viscount on-ramp closed.
  • I-10 westbound between Viscount and Hawkins proper lane closed.

Crews will probably be repairing concrete.

Montana Frontage Street Challenge

Wednesday, March 06 to Thursday, March 07

Nightly, 9:00 p.m. till 5:00 a.m.

  • Montana Avenue eastbound frontage street full closure between Lee Trevino Drive to Wooster.

Crews will probably be doing concrete paving.

Purple Coronary heart Loop 375 Widening

Saturday, March 02 by Friday, April 05

Each day, from 9:00 a.m. till 3:30 p.m.

  • Purple Coronary heart Freeway (Loop 375) north and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will probably be eradicating demo and hauling materials.

Loop 375 Widening Challenge

Sunday March 3, Tuesday March 5, by Thursday March 7

Nightly 9:00 p.m. till 5:00 a.m.

  • Loop 375 south- and northbound primary lane closure between North Loop Overpass and Zaragoza (POE) Overpass.
  • Zaragoza, Pan American and South Americas Truck (P.O.E) Underpass alternating full closures. 

Crews will probably be engaged on putting in bridge buildings, bridge deck pour, concrete pave, and hub cupboard.Â